BagsAndYards How much you need — and what it costs

Concrete for a 24×30 slab

A 24×30 ft slab at 4″ thick needs about 440 × 80 lb bags of concrete mix (with 10% waste) — or 10 cubic yards of ready-mix. Estimated materials cost ≈ $1,650 (ready-mix).

Volume240 ft³ = 8.89 cu yd
80 lb bags (no waste)400
80 lb bags (10% waste)440
60 lb bags (10% waste)587
Ready-mix10 cu yd
RecommendedOrder ready-mix

Adjust it

Change the size, thickness, bag size, or waste % below:

How much concrete do I need?

ft
ft
in
%
You'll need about
Bags (with overage)
Bags (no overage)
Ready-mix (delivered)
Estimated materials cost

Estimate for standard concrete mix (e.g. Quikrete #1101 / Sakrete High-Strength). Bag counts round up and include your overage %. Cost is an estimate (as of June 2026, US national average) — confirm bag price and ready-mix delivery (often a 1 yd³ minimum + short-load fees) with your supplier. Not a substitute for a structural engineer on load-bearing work.

Last updated: 2026-06-28.
Bag yields from the QUIKRETE #1101 data sheet. Cost figures are US-national-average estimates and vary by region and supplier.